incinerator of hospital pictures and drawings

what’s the incinerator of hospital pictures and drawings? if you want to build or buy new incinerator for hospital, confirm the waste capacity per day, like 100kgs per day or more and working time per day, like 10 hours and the capacity of incinerator is average 10kgs per hour and best to buy 10-20kgs per hour incinerator.
 
we supply small scale incinerator with cheap price cost for small hospital. if requst large capacity or more function, send the technical requirements to us.

 

 
 
Nanjing Clover Medical Technology Co.,Ltd.

buy a pharmaceutical incernation funnse in sa
what is incinarator
cremation cost
incinerator in mauritius
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on 
the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame. 
• The unit shall prevent leakage of the hot flue gas and any backfire. 
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber 
walls away from the fuel burner.
• A differential air pressure gauge connected to an electronic datalogger


Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

 

handover process shall include a detailed inspection and completion of a checklist and statement of operability.
” YES/NO
“Decommissioning, overhaul and repacking of the unit
Based upon a potential need for an incinerator unit to be moved to a new location the contractor will outline the key steps through a clear written procedure and direct demonstration by the contracted operator for the decommissioning and repacking of the units, so this can be achieved.
As part of this process it is envisioned that all bottom ash and fly ash will be removed, the unit will be cleaned, and the diesel fuel tank and generator will be completely emptied. The decommissioning work will include a detailed inspection and the replacement of any worn or damaged parts at the expense of the client.   This may include repacking into a sea container for transport to the new location. 

 
 
 
 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]