
Dual Chamber (Primary & Secondary) with insulation slabs (fully insulated internal refractory lining) along with controlled air blower for each chamber
Insulation / Refractory Thickness: ≥ 100mm
Chamber plate thickness: ≥ 6mm
Fuel Type: Natural gas based on burning fuel in combustion chambers
Waste Capacity: ≈ 150 Kg/Day
Incineration capacity: ≈ 25 Kg/Day (Separate waste charging and waste removal doors)
Burners: At least with (02) burners of automated start and stop functions
Combustion efficiency: > 97%
Temperature: programmable temperature with temp monitoring system
Residence time: 2 second in secondary chamber
Heating value: 4000 Kcal
Temperature Range: ≈ min 800oC to max 1200oC
Electrical supply: 220V with single phase
Chimney Plate Thickness: ≥ 5mm
Water scrubber: Scrubbing using reagent like lime & should made of SS 10 gauge of non-corrosion properties and painted exteriorly by equipment grade heat resistive enamel
Chimney Height: between 15-25 feet
Alarm: alarm to warn the operator if temperature drops in secondary chamber
Water Pump: at least 1.5HP sustainable with high pressure of at least 70 PSI or more than this