how so i buy an incineration

you have to do custom clearance your side. and shipping document with bill of lading, invoice, packing list only. we have incinerator in PK and AFG but iam not sure where it is. all incinerator passed EU CE and ISO. if natural gas or LPG fuel, you have to contact with local gas supplier to know price, we only supply gas burner. if oil fuel, we supply oil system and oil tank already. installation, we assembly all we can do before leave and local working almost on chimney, control case, oil system as our indication guider on the machine. local site have to build a incineration operation house, simple type with concrete foundation.
by now, covid19, we support online or video guide and free cost.
medical waste trucks
waste incinerator tanzania
modern incineration technology
ready mace incinerator
the need for a hospital incinerator
incinerator for hazardous waste construction
manufacturers of fuel disposal in chaina

Incinerator Items/Model HICLOVER TS5(PLC) HICLOVER TS10(PLC) HICLOVER TS20(PLC) HICLOVER TS30(PLC)
Burn Rate (Average) 5-10 kg/hour 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour
Feed Capacity(Average) 10kg/feeding 20kg/feeding 40kg/feeding 60kg/feeding
Control Mode PLC Automatic PLC Automatic PLC Automatic PLC Automatic
Combustion Chamber 52L 100L 210L 330L
Internal Dimensions 50x35x30cm 50x50x40cm 65x65x50cm 75x75x60cm
Secondary Chamber 26L 50L 110L 180L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 2P 220V 2P 220V 2P 220V 2P
Power 0.5Kw 0.5Kw 0.5Kw 0.5Kw
Burner Type Italy Brand Italy Brand Italy Brand Italy Brand
Oil Consumption (kg/hour) 4 6 8 12
Gas Consumption (m3/hour) 6.2-11.4 6.2-11.4 8-15.7 9.8–20
Temperature Monitor Yes Yes Yes Yes
Temperature Thermometer Corundum Probe Tube Corundum Probe Tube Corundum Probe Tube Corundum Probe Tube
Temperature Protection Yes Yes Yes Yes
Automatic Cooling Yes Yes Yes Yes
Automatic False Alarm  Yes Yes Yes Yes
System Testing Model Yes Yes Yes Yes
Time Setting Yes Yes Yes Yes
Progress Display Bar LCD Display LCD Display LCD Display LCD Display
Oil Tank 200L 200L 200L 200L
Oil Tank Stand 190cm Height 190cm Height 190cm Height 190cm Height
Liquid level Display  Yes Yes Yes Yes
Feeding Door 20x20cm 30x30cm 45x40cm 55x50cm
Chimney 2Meter 3Meter 3Meter 5Meter
Chimney Type Stainless Steel 304  Stainless Steel 304  Stainless Steel 304  Stainless Steel 304 
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000℃-1300℃ 1000℃-1300℃ 1000℃-1300℃ 1000℃-1300℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1000kg 1500kg 2200kg 3000kg
External Dimensions 120x80x110cm 140x90x120cm 160x110x130cm 175x120x140cm

Feeding Controlled hygienic, mechanical or automatic feeding methods must not negatively influence the air supply and temperature in the primary and secondary chambers of the incinerator.
Bottom ash removal system Units shall include an integral and mechanized bottom ash removal system, via rams or similar mechanisms that evacuate bulk ash from below the primary chamber without the need for frequent manual evacuation.
Diesel fuel storage and supply “Each unit shall include a diesel fuel storage tank of sufficient capacity to enable operation of the unit for 5 working days of 10 hours each.
• The unit shall include a pumping system and lines to supply the burners from the tank and the diesel-electric generator.  The pumping system will have two pumps in parallel for redundancy.
• The supply lines will be fabricated from steel tubing and adequately protected and supported against damage during operations and include shutoff valves for each line. 
• The unit shall be equipped with a fuel meter.Based upon a potential need for an incinerator unit to be moved to a new location the contractor will outline the key steps through a clear written procedure and direct demonstration by the contracted operator for the decommissioning and repacking of the units, so this can be achieved.
Operator training The operator/trainer will be provided on a day-rate reimbursable basis. The bidder must specify the minimum scope of work in terms of operator working days and travel days. Rates for these to be provided on the financial offer form.
The main task of the operator will be to deliver a centralized product familiarization course which will focus on providing hands on training to the client’s staff regarding the installation, commissioning, disassembling and re-packaging and maintenance of all the incinerators supplied under this Contract. This training session shall be held at the client’s location as well as potential assigned alternative locations. Training shall be conducted for each type of incinerator unit at the time of arrival and assembly of the incineration units.4.5.3 The goods are of the quality, quantity and description required by the Contract, including when subjected to conditions prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims of infringement of any 4.5.4intellectual property rights, including, but not limited to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods and for a period of not less than one (1) year following acceptance of the goods by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, upon notice by UNOPS that the goods do not conform to the requirements of the Contract, the Contractor shall promptly and at its own expense correct such non-conformities or, in case of its inability to do so, replace the defective goods with goods of the same or better quality or, at its own cost, remove the defective goods and fully reimburse UNOPS for the purchase price paid for the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any services that may be required in connection with any of the Contractor’s warranties under the Contract. 
As part of this process it is envisioned that all bottom ash and fly ash will be removed, the unit will be cleaned, and the diesel fuel tank and generator will be completely emptied. The decommissioning work will include a detailed inspection and the replacement of any worn or damaged parts at the expense of the client.   This may include repacking into a sea container for transport to the new location.