HICLOVER Mobile Containerized Incinerators

a. be based on common, well-proven and clean technology – both as a complete unit and in terms of its individual components.
b. be very robust, sturdy and capable of installation in remote locations subject to severe conditions.
d. generate residual incinerator ash conforming to <10% by volume and <25% by weight of the waste incinerated.
e. achieve a Total Organic Carbon (TOC) content in the slag and bottom ashes of less than 3%.
g. include clearly readable system operation panels.
h. include an operator’s manual (in English and French and Spanish).
i. require minimal preprocessing i.e. there shall be no/very limited need for prior sorting, crushing or shredding.
j. be capable of handling mixed solid waste streams and incinerable hazardous wastes as indicated.
k. can accommodate large variations in waste composition and calorific value.
l. allow for batch loading
m. incorporate an Air Pollution Control System suitable for basic emission control
n. have a thermal efficiency of not less than 85%.
o. primary and secondary chambers shall preferably have rounded inside corners to avoid the formation of dead zones or cold pockets
p. have very low levels of unburned material in the slag
q. include a supplement fuel source and storage unit (e.g., diesel tank),
“r.  proposals shall include the fuel consumption at the rated capacity
be CE Certified, meet relevant British, EU or American Standards, or equivalent.
The proposed incinerator units must be complete and include all of the key features listed below and all of the associated support services and interconnections
The forecasted feedstock loads, and daily loading rates are generally summarized as:
• Mixed general, clinical and incinerable hazardous wastes with a wide range of calorific values and densities.   The wastes will consist of 100% biomedical wastes.
• Wastes either small enough to fit within a 60 litre waste sack or broken up or shredded to less than 300mm in size.
• Operation on a daytime shift basis, 5 days per week.
• An 8 hour daily operating cycle of ash removal, pre-heat and burn with continuous loading if required.  The automated burn completion and cool down cycle will take place overnight.
• The incinerators shall be capable of using diesel fuel as a supplemental fuel while the associated management equipment shall be capable of using electricity as the primary power source.
• Also consider provision for meeting international emission standards.
Able to handle an average waste production of 100kg/day
“• Minimum load capacity: 20 kg
• Maximum load capacity: 40 kg
• Nominal burning rate: 10-30 kg/hr (= 80- 240 kg range per 8hour day)

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
medical waste incinerators,incinerators china

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes