{"id":1447,"date":"2018-05-08T10:08:17","date_gmt":"2018-05-08T18:08:17","guid":{"rendered":"http:\/\/hiclover.com\/blog\/?p=1447"},"modified":"2018-05-08T10:08:17","modified_gmt":"2018-05-08T18:08:17","slug":"hospital-incinerator-3","status":"publish","type":"post","link":"https:\/\/www.cloverx.net\/en\/hospital-incinerator-3\/","title":{"rendered":"hospital incinerator"},"content":{"rendered":"<p>small incinerator of up to burn rate of 100 kg\/h but We need bigger than that may you send to us the Technical specification for an hospital incinerator,home incinerator,animal incinerator prices<\/p>\n<p>Incinerator of the following specifications:<\/p>\n<p>1. Burn rate 200 kg\/hour<\/p>\n<p>2. Runing time not less than 10 hours<\/p>\n<p>3. Reducing wastes to 98%<\/p>\n<p>4. Max combustion of 1400 degree centigrade and 1100 degree centigrade during post combustion<\/p>\n<p>5. Complete mecttalic chimney 400 mm diameter with height of 8m high with support and the following features:<\/p>\n<p>1800L, COMBUSTION BURNER ( 2 PRIMARY BURNERS AND 1 SECONDARY BURNER), vENT-POINTS, CONTROL BOX, THERMALCOUPLES, BURNER BLAST TUBE<\/p>\n<p>BURNER DIFFUSERS, BURNER NOZZLES DIFUSERS, RHOBUST, CHAMBER MOUNTED MLD STEEL EXTENDABLE CHIMNEY , CONTROL SYSTEM S, BURNER OPERATIONS<\/p>\n<p>AUTOMATIC ON\/OFF<\/p>\n<p>6. The incinerator should be able to handle the folowing cumbustible hospital wastes ; Laboratory and Clinical wastes, Type A, B, C, D<\/p>\n<p>and E of medical wastes<\/p>\n<p>Construction requirements for Combustible chamber and Secondary after chamber ( Post combustion of gases)<\/p>\n<p>we will handle ourself but you will send the drawing and iff possible you give us the installation instruction and training of how to use<\/p>\n<p>and commissioning to us<\/p>\n","protected":false},"excerpt":{"rendered":"<p>small incinerator of up to burn rate of 100 kg\/h but We need bigger than that may you send to us the Technical specification for an hospital incinerator,home incinerator,animal incinerator prices Incinerator of the following specifications: 1. Burn rate 200 kg\/hour 2. Runing time not less than 10 hours 3. Reducing wastes to 98% 4. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1445,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[40],"tags":[],"class_list":["post-1447","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-incinerator-qa"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/posts\/1447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/comments?post=1447"}],"version-history":[{"count":0,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/posts\/1447\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/media\/1445"}],"wp:attachment":[{"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/media?parent=1447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/categories?post=1447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cloverx.net\/en\/wp-json\/wp\/v2\/tags?post=1447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}